Reactive work and PM program review
Every task tested against what has actually failed
I go through the reactive work you've recorded and the preventive tasks you're running, and I test one against the other. Which tasks earn their place because something has actually failed that way. Which ones are inherited from a manual and have never caught anything. What keeps breaking that has no task against it at all.
That means walking the plant and looking at the equipment, not just reading the records — including the controls and instrumentation, which I read and verify myself. Where the drawings and the control narrative disagree with what's installed, that's a finding, not an inconvenience.
$3,000 – $8,000 CAD
Fixed fee, quoted after the call. Scales with plant size and how much equipment is in scope.
- Task-by-task verdict on your PM program: keep, change interval, drop, add
- Reactive work sorted by what it says about equipment condition
- Equipment with no task against it, ranked by what failure would cost you
- Controls, instrumentation and drawings checked against what is installed
- Written so your manager or your next contractor can act on it without me